Everything below comes from B&K's Google reviews, quoted in full where shown and paraphrased with the reviewer's name elsewhere — nothing is B&K's own promise. Every job is different; the only way to know yours is to ask.
01Often it's the pipe underneath
Spencer Mitchell had the drain pipe under a paved driveway replaced. His review is a list: the process explained start to finish, on time for the quote and the start, a fair quote, and cleanup above and beyond. Bryan Pasterick's rehabilitation replaced the failing drain pipe under the drive and placed and graded new stone over the entire surface.
Just had B&K replace a drain pipe under paved driveway. Kurt and his crew did a fantastic job. 1. explained the process from start to finish. 2. did anything I ask without question. 3. they were on time for quote and start of job. 4. gave a fair quote price. 5. they went above and beyond to clean up on job completion. 6. explained process during job. Very satisfied with the job B&K did, would recommend and I will use them again.
02Long, downhill drives
Thomas Covaleski's drive was fairly long and downhill, and he was in dire need. Bob and Kurt gave him options, worked to meet his price point, exceeded his expectations on quality and finished early.
We were in dire need of help with our driveway. Fairly long and down hill. Bob and Kurt were prompt and professional. They gave us different options and worked with us to meet our price point. In the end they exceeded our expectations for quality, workmanship and completed the job early.
03Water running down it
Craig Miller's driveway got a culvert underneath and a ditch down the side to handle water running off the mountain — done in a day. susan snyder's driveway was totally redone in a day and a half, and the crew came back during a long rainy stretch to check the drainage.
What a blessing to have my driveway totally redone in just a day and a half. Beautifully finished with total attention to detail. Very professional, clean, neat, and organized. I am 100% satisfied. The crew even came back during this extended rainy period to check the drainage! Now that is dedication to a job well done. Thank you so very much.
04Pads for trailers and more
Ralph Smith needed somewhere to store a new trailer. A stone pad was estimated by phone in 15 minutes, built on the planned date, and came in slightly under the estimate.
What to have ready
- Roughly how long the drive is, and how steep
- Paved or stone, and where the water goes when it rains
- Photos of the worst spots
- Whether there's a pipe or culvert under it now (if you know)


